GPU Cloud Cost Calculator

Enter a GPU type, a count and monthly usage to estimate what the cluster costs on AWS, Google Cloud and Azure at published on-demand list prices — and to see what those hourly rates leave out.

📊 Source Vendor public list prices 🗓 Observed September 2026 🧮 Basis On-demand only

Your workload

Selected usage: 730 h
Hyperscaler rates are 8-GPU node prices divided by eight GPUs. Most hyperscaler H100/H200 capacity is sold as full 8-GPU nodes; AWS also offers a single-GPU p5.4xlarge at the same per-GPU rate.
AWSp5.48xlarge
$0
per month · $0 / GPU-hour
Google Clouda3-highgpu-8g
$0
per month · $0 / GPU-hour
AzureND96isr H100 v5
$0
per month · $0 / GPU-hour
Spread across the three hyperscalers — most expensive ÷ least expensive on-demand list price —
OMC Network TBA · mainnet Q1 2027

OMC has not published network rates and is not selling compute today. Enter a hypothetical rate below to see the arithmetic — the number is your own assumption, not a quotation, forecast or commitment by OMC.

Hypothetical only. Any figure here is computed from the rate you typed and must not be read as an OMC price commitment.
Reference data

Published on-demand list prices

USD per GPU-hour. Hyperscaler figures are 8-GPU node prices divided by eight; Lambda and CoreWeave are quoted per GPU or per node as noted.

GPU AWS Google Cloud Azure Lambda CoreWeave
H100 80GBSXM5 · node spec in notes $6.88p5.48xlarge · $55.04 ÷ 8 $11.06a3-highgpu-8g · $88.49 ÷ 8 $12.29ND96isr H100 v5 · $98.32 ÷ 8 $3.99per GPU, on demand $6.16HGX H100 · $49.24 ÷ 8
H200 141GBSXM · node spec in notes $7.91p5en.48xlarge · $63.30 ÷ 8 $10.60a3-ultragpu-8g · $84.81 ÷ 8 $13.78ND96isr H200 v5 · $110.24 ÷ 8 — $6.31HGX H200 · $50.44 ÷ 8
On-demand list prices as published by each vendor, observed September 2026 in US regions (AWS us-east-1, Google Cloud us-central1, Azure East US). Excludes tax, storage, networking and support. Spot, preemptible and committed-use prices are lower — Google, for example, prices H200 below H100, so read the row, not the generation. Rates change often: confirm current pricing with the vendor before relying on any figure here. Sources: AWS EC2 on-demand pricing, Google Cloud accelerator-optimized pricing, Azure Retail Prices API, Lambda and CoreWeave public pricing pages.
Total cost of ownership

What the hourly rate leaves out

Three cost mechanisms most price tables ignore, and which decide the real bill far more than the headline rate.

⏱️

Idle hours are billed

A p5.48xlarge bills $55.04 per hour whether its eight GPUs are training or doing nothing — roughly $4,000 over a single long weekend. On-demand pricing charges for wall-clock time, not for work delivered.

Wall-clock billing
📡

Egress sits on another page

Outbound data is priced separately: about $0.09/GB on AWS, $0.08/GB on Azure and $0.08–0.12/GB on Google Cloud. For a mid-sized H100 deployment moving checkpoints and outputs, that commonly adds four figures a month.

Data transfer
🔒

Discounts do not cover the GPUs

The capacity AI teams actually buy is often excluded from the discounts designed to save money: AWS Spot is outside Savings Plans, Capacity Blocks are outside both Savings Plans and Reserved Instances, and Google excludes A3/A4 from flexible committed-use discounts.

Commitment structure
Design intent

How OMC's model is designed to differ

A comparison of billing mechanics, not prices. OMC has published no network rates; the items below are design commitments from the whitepaper and may change before mainnet.

Dimension Hyperscaler on-demand OMC (designed)
Billing unitPer hour, whole instancePer job, with per-second micropayments on the L2 rollup
Idle timeRunning hours are billedIntended to settle only for accepted, verified work
Capacity accessRegional quota limits and availability gatesPermissionless, subject to supply on the network
CommitmentNone required; discounts need 1–3 year commitmentsNo commitment required by design
PaymentFiat, via vendor billingOMC or supported stablecoins (USDT / USDC on BNB Chain)
Result verificationProvider trustTiered verification policy per job type (spot-check re-execution, redundancy, TEE)
Design commitments reflect OMC whitepaper v3.0 and are stated as intent, not as shipped functionality. OMC is in testnet; mainnet is targeted for Q1 2027. Nothing here is a price commitment, a service-level commitment or an offer to sell compute.
Questions

Frequently asked questions

Why is there no OMC price in the calculator?

Because there is no published OMC network rate to quote. The mainnet is targeted for Q1 2027, and until rates are set and published, any figure we printed would be an invention. Instead the calculator lets you type your own hypothetical rate and shows you the arithmetic — clearly labelled as your assumption, not our price.

What exactly does "per GPU-hour" mean in the table?

Hyperscalers sell GPU capacity inside fixed machine shapes. AWS p5.48xlarge, Google's a3-highgpu-8g and Azure's ND96isr H100 v5 each bundle eight H100 GPUs, so the honest comparable number is the node price divided by eight. Comparing a per-node price against a per-GPU price is the single most common way GPU price tables mislead — a headline "$49.24" can be more expensive per GPU than a "$3.99" once the unit is aligned.

Do these figures include storage, networking and support?

No. They are compute list prices only. Storage, egress, load balancers, snapshots and any support tier sit on top, and for sustained deployments those lines are material — egress alone commonly adds four figures a month for a mid-sized training cluster.

Why not show spot, reserved or committed-use rates?

Spot and committed rates are real and often far lower, but they are not like-for-like: spot capacity can be reclaimed, and committed-use discounts require one- to three-year commitments and often exclude the newest GPU families. Mixing them into one table is how "cheapest" claims get made. This page sticks to on-demand list prices, which are the only rates that are both published and directly comparable.

How current is this data, and how often is it updated?

The rates were observed in September 2026 from vendor pricing pages. GPU pricing changes frequently, so we date every figure rather than presenting it as permanent. Treat this as a well-sourced starting point for your own modelling, and confirm live pricing with the vendor before you commit budget.

Can I buy compute on OMC today?

No. OMC is operating a public testnet. Mainnet — when the network can accept paying jobs and providers can earn — is targeted for Q1 2027. You can join the testnet now and claim the community airdrop, but there is no compute to purchase and no price to pay.

Model your own workload

The methodology behind OMC's delivered-cost comparisons, and the full billing design, are documented in the whitepaper.

Disclaimer: this calculator is an educational tool. Figures are third-party list prices observed in September 2026 and are provided without warranty; they are not an offer, a quotation or financial advice. OMC publishes no network rate and sells no compute today.